Roadway and Drainage Improvements / Municipal Highway Garage
The following documents are provided for informational purposes only:

*Ballot Question for referendum, 09-06-2012

*Space Needs Summary, 05-01-2012

*Appraisal 5 Cherry Brook Road, Robert Bartos, SRA, 10-22-2009

*Presentation on New Public Works Facility from Joint BOS/BOF Meeting-8/20/12

General Reports
1. Highway Garage Study Committee Final Report, 12-15-1999
2. Updated Highway Garage Facilities Plan, Weston & Sampson Engineers, Inc., 12-18-2007
3. Geotechnical Feasibility Study, Weston & Sampson Engineers, Inc., 08-26-2011
4. Partial Schematic Design, Weston & Sampson Engineers, Inc., 07-18-2012
    
Part 1
    Part 2
    Part 3
    Part 4
    Part 5
    Part 6
5. Phase I Environmental Site Assessment, Weston & Sampson Engineers, Inc., 01-01-2010
6. Limited Phase II Subsurface Investigation, Weston & Sampson Engineers, Inc., 02-02-2010

Site Selection
1. Final Report-Site Selection Study, Weston & Sampson Engineers, Inc., 05-27-2009
2. 79 Dowd Avenue Permitting Assessment,  Weston & Sampson Engineers, Inc., 11-02-2010
3. 20 Canton Springs Road Site Evaluation,  Weston & Sampson Engineers, Inc.,  06-29-2011 (revised 08-22-2011)
4. Updated report-Site Evaluation Three (3) new sites, Weston & Sampson Engineers, Inc., 12-06-2011
    
Part 1
    Part 2
    Part 3
    Part 4
5. 50 Old River Road Evaluation, Weston & Sampson Engineers, Inc., 04-06-2012
6. 66 Lovely Street Site Evaluation, Weston & Sampson Engineers, Inc., 05-01-2012
7. Canterbury Heights & 361 Albany Site Evaluation, Weston & Sampson Engineers, Inc., 05-10-2012

Building and Site Design
1. Landscape Design, Weston & Sampson Engineers, Inc., 07-16-2012
2. Canton DPW Plant rendering, Weston & Sampson Engineers, Inc., 07-16-2012
3.  Existing Conditions plan C-1, Weston & Sampson Engineers, Inc., 07-16-2012
4.  Site Layout plan C-2, Weston & Sampson Engineers, Inc., 07-16-2012
5.  Roadway Profiles C-3, Weston & Sampson Engineers, Inc., 07-16-2012
6.  Grading and Storm water Management Plan C-4, Weston & Sampson Engineers, Inc., 07-16-2012
7.  Erosion and Sedimentation Control Plan C-5 , Weston & Sampson Engineers,Inc., 07-16-2012
8.  Utility Plan C-6, Weston & Sampson Engineers, Inc., 07-16-2012
9.  First Floor Plan, Weston & Sampson Engineers, Inc., 07-17-2012
10. First Floor Color Area Plan, Weston & Sampson Engineers, Inc., 07-17-2012
11. Exterior Building Elevations, Weston & Sampson Engineers, Inc., 07-17-2012
12. Exterior Model Views 1, Weston & Sampson Engineers, Inc., 07-17-2012
13. Exterior Views 2, Weston & Sampson Engineers, Inc., 07-17-2012
14. 3-D Rendering Views 1-5, Weston & Sampson Engineers, Inc., 07-02-2012

Cost Estimates
1.  Public Works Facility cost estimate, Weston & Sampson Engineers, Inc., 08-02-2012
2.  Independent cost estimate, TCI Construction Cost & Project Management, 08-02-2012
3.  Design-Build cost estimate, Borghesi Building & Engineering Co. Inc., 08-15-2012

Pavement Management
1. Pavement Presentation with maps and street lists, Vanasse Hangen Brustlin, Inc., 03-02-2011
2. Total Backlog of Road Improvements