Roadway and Drainage Improvements / Municipal Highway Garage The following documents are provided for informational purposes only: *Ballot Question for referendum, 09-06-2012 *Space Needs Summary, 05-01-2012 *Appraisal 5 Cherry Brook Road, Robert Bartos, SRA, 10-22-2009
*Presentation on New Public Works Facility from Joint BOS/BOF Meeting-8/20/12 General Reports 1. Highway Garage Study Committee Final Report, 12-15-1999 2. Updated Highway Garage Facilities Plan, Weston & Sampson Engineers, Inc., 12-18-2007 3. Geotechnical Feasibility Study, Weston & Sampson Engineers, Inc., 08-26-2011 4. Partial Schematic Design, Weston & Sampson Engineers, Inc., 07-18-2012 Part 1 Part 2 Part 3 Part 4 Part 5 Part 6 5. Phase I Environmental Site Assessment, Weston & Sampson Engineers, Inc., 01-01-2010 6. Limited Phase II Subsurface Investigation, Weston & Sampson Engineers, Inc., 02-02-2010 Site Selection 1. Final Report-Site Selection Study, Weston & Sampson Engineers, Inc., 05-27-2009 2. 79 Dowd Avenue Permitting Assessment, Weston & Sampson Engineers, Inc., 11-02-2010 3. 20 Canton Springs Road Site Evaluation, Weston & Sampson Engineers, Inc., 06-29-2011 (revised 08-22-2011) 4. Updated report-Site Evaluation Three (3) new sites, Weston & Sampson Engineers, Inc., 12-06-2011 Part 1 Part 2 Part 3 Part 4 5. 50 Old River Road Evaluation, Weston & Sampson Engineers, Inc., 04-06-2012 6. 66 Lovely Street Site Evaluation, Weston & Sampson Engineers, Inc., 05-01-2012 7. Canterbury Heights & 361 Albany Site Evaluation, Weston & Sampson Engineers, Inc., 05-10-2012 Building and Site Design 1. Landscape Design, Weston & Sampson Engineers, Inc., 07-16-2012 2. Canton DPW Plant rendering, Weston & Sampson Engineers, Inc., 07-16-2012 3. Existing Conditions plan C-1, Weston & Sampson Engineers, Inc., 07-16-2012 4. Site Layout plan C-2, Weston & Sampson Engineers, Inc., 07-16-2012 5. Roadway Profiles C-3, Weston & Sampson Engineers, Inc., 07-16-2012 6. Grading and Storm water Management Plan C-4, Weston & Sampson Engineers, Inc., 07-16-2012 7. Erosion and Sedimentation Control Plan C-5 , Weston & Sampson Engineers,Inc., 07-16-2012 8. Utility Plan C-6, Weston & Sampson Engineers, Inc., 07-16-2012 9. First Floor Plan, Weston & Sampson Engineers, Inc., 07-17-2012 10. First Floor Color Area Plan, Weston & Sampson Engineers, Inc., 07-17-2012 11. Exterior Building Elevations, Weston & Sampson Engineers, Inc., 07-17-2012 12. Exterior Model Views 1, Weston & Sampson Engineers, Inc., 07-17-2012 13. Exterior Views 2, Weston & Sampson Engineers, Inc., 07-17-2012 14. 3-D Rendering Views 1-5, Weston & Sampson Engineers, Inc., 07-02-2012 Cost Estimates 1. Public Works Facility cost estimate, Weston & Sampson Engineers, Inc., 08-02-2012 2. Independent cost estimate, TCI Construction Cost & Project Management, 08-02-2012 3. Design-Build cost estimate, Borghesi Building & Engineering Co. Inc., 08-15-2012 Pavement Management 1. Pavement Presentation with maps and street lists, Vanasse Hangen Brustlin, Inc., 03-02-2011 2. Total Backlog of Road Improvements